Skip to main content
Loading

Presentation Hub - From Detection to Intervention: Advancing Integrity and Life Extension of Production Systems

Tuesday, 4 May
Presentation Hub - Station 2
Presentation Hub
This session presents recent advances in sustaining the performance and extending the service life of production assets. Contributions explore real-time monitoring, advanced inspection and data-driven prediction as means of detecting degradation early and informing timely intervention. Further papers address the design and qualification of equipment and materials for demanding service conditions, including high-pressure, multiphase and CO2-rich environments. Field case studies illustrate well intervention, barrier restoration, completion strategy and water treatment practices that reduce operational risk and preserve productivity. Collectively, the presentations offer practical, field-validated approaches to strengthening integrity management and optimizing lifecycle performance.
Chairperson(s)
Alvaro Jimenez Loayza - SLB
Joao Humberto Guandalini Batista, Innovation Manager - Foresea
Sponsoring Society:
  • Society of Petroleum Engineers (SPE)
  • Alternate 37371
    Lookback Evaluation Of Commingled Vs. Single-completion Production Performance, Including Workover-related Challenges, From Two Deepwater Non-paleogene Fields In The Gulf Of America
    G.C. Thakur, S. Prakash, X. Du, University of Houston
  • Alternate 37330
    Development And First Deepwater Application Of An Intelligent Motor-manipulated System For Dhsv Exercise And Lock-open Verification
    M. Powell, Welltec A/S; M. Hornnes, Autentik AS; G. Johnsen, Welltec Norway
  • Alternate 37376
    Pressure-enhanced Low-temperature Sealing Of A Low-permeability Fkm For High-pressure Co₂ Seals And Packers
    X. Chen, SLB N.V.
  • Alternate 37579
    Molecular Characterization And Field Trial Of A Novel Biocide In Fpso Seawater Injection Systems
    M. Paschoalino, Solugen Inc
  • Alternate 37400
    Fixing Sustained Annulus Pressure And Abandoning Wells With Perf, Wash, And Cement (PWC): A Case Study From Offshore Malaysia
    M.A. Jaculli, E. Engelsgjerd, J.B. Chesson, HydraWell @ SLB
  • Alternate 37322
    Prediction Of CO2 Removal Membranes Lifetime Based On Multivariable Linear Regression
    A.J. Vieira, L.F. Frutuoso, Petrobras
  • Alternate 37292
    Real Time Detection Of Choke Flow Coefficient Deviation To Optimize Valve Settings And Prolong Choke Lifetime In High-rate Dry Gas Wells
    J. Jorgin, M.B. Alali, W. Alisawi, A. Almobarak, Saudi Aramco
  • Alternate 37293
    Design And Maintenance Of Inlet Devices For Production Separators Best Practice: Mitigating The Risks Of Transients
    F. Aluraik, A. Wosaifer, C.L. Grim, Saudi Aramco
  • Alternate 37299
    Solid-state Electromagnetic Inspection Towards Post-frac Wellbore Integrity Issues: Case Study On Quantitative Diagnosis And Horizontal-well Intervention
    Z. Tong, PetroChina Intl Ltd; R. Wei, Research Inst Petr Expl & Dev; H. Liu, China Natl. Petroleum Corp.
  • Alternate 37475
    Low-shear Centrifugal Pumping Of Produced Water: Experimental And CFD Investigation Of Droplet Breakup And Turbulent Energy Dissipation
    R.C. Oliveira, M.A. Souza, L.F. Barca, M.F. Tai, F.V. Ansani, Itajuba Federal University - Brazilian Pre-salt Technology Center; A.S. Monteiro, F.S. Da Silva, Petrobras S/A

Countdown to OTC 2027!