Skip to main content
Loading

Presentation Hub - Well Construction, Completions and Stimulation

Monday, 3 May
Presentation Hub - Station 2
Presentation Hub
This presentation hub session gives the OTC program committee a special opportunity to showcase talented technical leaders from across the industry and the globe.
Chairperson(s)
Ashutosh Dikshit, Engineering Manager - SLB
Aiman Al-Showaiter, Principal Pipeline Engineer - Wood Group USA Inc
Sponsoring Society:
  • Society of Petroleum Engineers (SPE)
  • Alternate 37407
    High Pressure High Temperature Plug Activated Mechanical Isolation Device Deployment Accelerates Temporary Abandonments Of High Pressure High Temperature Development Wells In The Gulf Of America
    T. Reid, G. Parria, T. Chase, E. Smith, Chevron Corporation; K. Gonzales, P. Stokes, Innovex
  • Alternate 37319
    Advancing Plug And Abandonment Practices For Complex Completions: Aquifer Isolation In Dump Flood Wells
    O.T. Mirza, ADNOC Offshore
  • Alternate 37385
    API 11D1 V0 Testing Of A Completion Packer Element Assembly With A Rubber Compound Developed Exclusively For CCUS Applications
    S. Meng, Q. Liu, X. Wang, J. Maynard, K. Roberts, J. Yue, J. Ren, P. Cheng, Z. Yang, CNPC USA
  • Alternate 37391
    New Perspectives To Improve Sand Control Design
    M. Fuller, Chevron U.S.A. Inc.; C. Fischer, Constien & Assocs. Inc.
  • Alternate 37287
    From Trial To Redevelopment: First 7-in. Taml Level 5 Multilateral Completion In Thailand, As For Future Brownfield Expansion
    M. Md Noor, Schlumberger (M) Sdn Bhd

Countdown to OTC 2027!